Sign In | Join Free | My himfr.com
Home > Bailey Suspension bridge >

Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge

    Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers
     
    Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers
    • Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers
    • Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers
    • Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers
    • Buy cheap Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge from wholesalers

    Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge

    Ask Lasest Price
    Brand Name : Great Wall
    Model Number : 321
    Certification : ISO,SGS,CCIC,BV,CNAS
    Price : Negotiation
    Payment Terms : T/T, L/C
    Supply Ability : 12000TON each year
    Delivery Time : Depending on the quantity
    • Product Details
    • Company Profile

    Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge

    Suspension Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing te advantages of quick erection,short construction time and te bridge components can be used repeatedly;The span length is adapted to 60-300m.

    Specification:


    NameBailey Suspension Bridge
    AliasBailey suspension bridge; Assembled highway steel bridge, steel bridge, steel trestle bridge; Temporary sidewalk; Temporary sidewalk; Bailey bridge;
    Model321; 200; GW D;
    Commonly used truss plate models321 type Bailey film, 200 type Bailey film, GW D type Bailey film, etc.
    Design maximum single span of steel bridge300 meters
    Standard lane width of steel bridgesingle lane 4 meters; double lane 7.35 meters; design according to demand.
    Load ClassAutomobile Class 10; Vehicle Class 15; Vehicle Class 20; Track Class 50; Trailer Class 80; Bicycle 40 tons; AASHTO HS20, HS25-44, HL93, BS5400 HA + HB; City-A; City-B; Highway-I; Highway-II; Indian Standard Class-40; Australian Standard T44; Korean Standard D24, etc. "
    Design schemeAccording to the different spans and loads, choose the appropriate arrangement and suspension bridge scheme.
    Main Material of Steel BridgeGB Q345B
    Connection pin material30CrMnTi
    Connection bolt grade8.8 grade high strength bolt; 10.9 grade high strength bolt.
    Surface anti-corrosionhot-dip galvanizing; paint; heavy-duty anti-corrosion paint for steel structure; asphalt paint; anti-skid aggregate treatment for bridge deck, etc.
    Bridge erection methodscantilever launching method; hoisting method; floating method; in-situ assembly method; pile-up construction method, etc.
    Installation time30-60 sunny days after abutment and other conditions are met (determined by bridge length and site conditions)
    Installation requirements15-20 workers (determined according to site conditions)
    Installation equipmentcrane, hoist, jack, hand hoist, welding machine, generator, etc. (adjustable according to site conditions)
    Features of steel bridgelarge span, no need to make pier, fast assembly, interchangeable, removable, long service life
    CertificationISO, CCIC, BV, SGS, CNAS, etc.
    Implementation criteriaJT-T/728-2008
    ManufacturerZhenjiang Great Wall Heavy Industry Engineering Technology Co., Ltd.
    Annual output12,000 tons

    Quality Bailey bridge/Bailey Suspension bridge/Steel structure suspension bridge for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhenjiang Great Wall Group Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)