Sign In | Join Free | My himfr.com
Home > Muti-span Bailey Bridge >

The gap that needs to be crossed is too large to use single span structure for

The gap that needs to be crossed is too large to use single span structure for

The gap that needs to be crossed is too large to use single span structure for

When a gap to be bridged is too wide to be economically crossed by a single span structure, it is necessary to provide intermediate piers and install a multi-span bridge. The positioning of ...

Send your message to this supplier
 
*From:
*To: Zhenjiang Great Wall Group Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)